Our process

From layout to permit in four steps.

Every job follows the same path, whether it is a single run of selective rack or a full distribution center.

Process steps

  1. 1

    Send the layout

    Send the plans, rack information and project address, or use one of our prelim request forms.

  2. 2

    Get a prelim

    We size the members and return a preliminary design to quote from.

  3. 3

    Calcs and drawings

    Full seismic calculations and stamped drawings for the final configuration.

  4. 4

    Permit and close-out

    We prepare the submittal and stay with it through jurisdictional approval, installation and final permit issuance.

Before you send

What helps us start.

Don't have everything? Send what you have. A layout and an address are enough to begin.

  1. 1 Layout drawing (PDF or DWG) with aisle and row dimensions
  2. 2 Project address (for site seismic parameters)
  3. 3 Rack type and manufacturer, if known
  4. 4 Frame heights, depths and beam levels
  5. 5 Pallet loads per level and pallet sizes
  6. 6 Slab thickness and concrete strength, if known
  7. 7 Any deadline or plan-check comments you already have

Have a layout ready?

Send it over for a prelim, or call and talk it through with an engineer.